Location: Storrs, Connecticut Area: Various Completion: Ongoing since 2014 DESCRIPTION Antinozzi Associates was awarded an on-call contract with the University of Connecticut in 2014. Since then we have been assigned lead coordination on a wide range of projects, are...
Location: Bridgeport, Connecticut Area: Campus-wide Completion: Ongoing DESCRIPTION Since 2002, we have provided on-call architectural and interior design services for numerous campus facilities, including the Arnold Bernhard Center, the School of Engineering...
Location: University Hall at the University of Bridgeport in Bridgeport, Connecticut Area: 60,000 Square Feet Completion: August 2016 DESCRIPTION In 2006, Antinozzi Associates prepared a feasibility study for the University of Bridgeport to convert the 10-story Schine...